Everything that changed across every job, newest first — what was ingested, decided, flagged, or acted on. The portfolio's running record of how the truth moved.

79 events

May 14, 2026 · 1 day ago

TruthHarborline TowerTruth Finder

Current truth · AI confidence 91%

This job is at risk because the latest customer-approved drawings (Rev C) do not match the shop team's current working files (Rev B). Rev C revises the top-rail profile and adds two intermediate posts per run.

TruthMidtown ExchangeTruth Finder

Current truth · AI confidence 85%

The install plan is stale. Three RFIs answered by Outlook in the last two weeks changed the anchor layout and sequence, but the PM schedule is unchanged since April 21.

TruthNorthgate MallTruth Finder

Current truth · AI confidence 81%

A material substitution to a lighter gauge was discussed on the May 9 call to hold the budget, but the approved submittal still specifies the heavier gauge. The substitution is unconfirmed.

IngestedMidtown ExchangeKaren Liu

Ingested smartsheet export — Midtown_Schedule_Export_May_14.xlsx

Last modified Apr 21. No RFI tasks present in the schedule.

May 13, 2026 · 2 days ago

TruthBeacon PlazaTruth Finder

Current truth · AI confidence 80%

Stair fabrication is progressing but the welding specification cited verbally on the May 6 Teams coordination call has not been confirmed by the engineer of record. The shop drawing callout and the verbal note disagree.

TruthFoundry LoftsTruth Finder

Current truth · AI confidence 78%

Foundry Lofts is at risk because the balcony live-load rating differs between the customer requirements PDF and the structural sketch — fabrication detailing should not proceed until it is frozen.

TruthRiverside LogisticsTruth Finder

Current truth · AI confidence 93%

Truss fabrication is aligned: the approved drawing set, the mill certs PDF, and the erection sequence confirmed by email all agree.

TruthHarbor MarinaTruth Finder

Current truth · AI confidence 95%

Davit and gangway fabrication is fully aligned across the approved load sheet, the finish email, and the confirmed delivery window.

TruthCrossfield StadiumTruth Finder

Current truth · AI confidence 91%

Bollard fabrication is aligned: the crash-rated submittal, the foundation detail, and the surveyed layout all agree.

TruthAtlas FoodsTruth Finder

Current truth · AI confidence 76%

Atlas conveyor framing is at risk because a higher conveyor load requested in a May 10 email has not been reconciled with the approved frame design — detailing should hold.

DecisionHarborline TowerKaren Liu (PM)

Decision recorded

No further material cuts until the shop acknowledges Rev C.

DecisionRiverside LogisticsRiverside Logistics

Decision recorded

The approved IFC truss set is the single governing fabrication set.

DecisionHarbor MarinaHarbor Marina Authority

Decision recorded

Marine-grade 316 stainless confirmed for all gangway and davit steel.

DecisionCrossfield StadiumCrossfield Stadium Authority

Decision recorded

Bollard crash rating and embedment per the approved submittal.

IngestedRiverside LogisticsDana Reyes

Ingested drawing — Riverside_Truss_Set_APPROVED.pdf

Approved long-span truss set. Erection sequence and crane pick plan confirmed by email.

IngestedHarbor MarinaGrace Holloway

Ingested pdf — Harbor_Davit_Load_Sheet.pdf

Davit working load and gangway live load confirmed. Hot-dip galvanized finish, delivery week of June 15.

IngestedCrossfield StadiumVictor Ortega

Ingested pdf — Crossfield_Bollard_Submittal.pdf

Crash-rated bollard submittal approved; foundation detail and surveyed layout confirmed.

May 12, 2026 · 3 days ago

TruthApex LogisticsTruth Finder

Current truth · AI confidence 77%

The shop drawing dimensions for the loading-dock handrail runs do not match the dimensions in the customer's May 11 Outlook update — a revision-control gap.

TruthBriargrove EstatesTruth Finder

Current truth · AI confidence 96%

Gate fabrication is fully aligned across all sources. Profile, finish (satin black powder coat), and the install window are confirmed in writing on the SharePoint.

TruthMaple CourtTruth Finder

Current truth · AI confidence 78%

Stair-tower fabrication is mostly aligned, but the landing fire-rated assembly differs between the architectural spec and the May 8 coordination email — needs written confirmation.

TruthVertex Data CenterTruth Finder

Current truth · AI confidence 75%

Screen-wall detailing is progressing, but the wind-load basis mentioned on the May 7 Teams call has not been reconciled with the structural drawing — needs EOR confirmation.

TruthGranary LoftsTruth Finder

Current truth · AI confidence 92%

Spiral-stair fabrication is aligned: the approved geometry, the field-verified shaft dimensions, and the finish are all confirmed in writing.

ConflictMidtown ExchangeTruth Finder

Conflict detected — RFI-Driven Scope Not in Schedule

Three RFIs answered by Outlook changed the anchor layout and sequence; the PM schedule is unchanged for 23 days.

ConflictMidtown ExchangeTruth Finder

Conflict detected — Anchor Type Discrepancy

RFI-014 sketch shows an epoxy anchor where the approved submittal shows a mechanical anchor.

DecisionMidtown ExchangeGC / EOR

Decision recorded

Latest answered RFI governs the anchor layout.

DecisionGranary LoftsGranary Development

Decision recorded

Approved 3D geometry model governs the spiral stair fabrication.

ActionMidtown ExchangeGreg Mason

Answered RFI-014

Revised anchor layout, adhesive anchors at slab edge — supersedes original.

IngestedHarborline TowerMarcus Reed

Ingested spreadsheet — Harborline_RFI_Log.xlsx

Open RFIs: top-rail termination at stair, embed plate locations.

IngestedMidtown ExchangeGreg Mason

Ingested email — Midtown_RFI_014_Response.eml

Proceed with revised anchor layout per attached sketch. Revised detail indicates adhesive (epoxy) anchors at slab edge. This supersedes the original detail.

IngestedGranary LoftsMaya Lindholm

Ingested drawing — Granary_Spiral_Geometry_APPROVED.pdf

Approved spiral geometry; shaft dimensions field-verified and finish confirmed.

May 11, 2026 · 4 days ago

TruthLakeside PavilionTruth Finder

Current truth · AI confidence 74%

Canopy fabrication is on track but the corrosion-coating system is described two ways: the spec PDF calls for hot-dip galvanizing, the kickoff email says galvanize then powder coat.

TruthBelmont HotelTruth Finder

Current truth · AI confidence 74%

Balustrade fabrication is mostly aligned, but the bronze patina described in customer emails ('warm, living finish') does not clearly match the approved finish-sample callout — needs confirmation.

ConflictApex LogisticsTruth Finder

Conflict detected — Shop Drawing vs. Customer Dimension Update

The customer's May 11 email gives loading-dock dimensions that differ from the current shop drawing set.

DecisionBelmont HotelBelmont Hospitality

Decision recorded

Bronze patina not released until approved against the lobby mockup.

ActionApex LogisticsLydia Chen

Issued dimension update

Dock handrail runs are 11'-4", not 10'-8" as drawn.

IngestedApex LogisticsLydia Chen

Ingested email — Apex_Dock_Dimensions_Update.eml

The dock handrail runs are 11'-4", not 10'-8" as previously drawn.

IngestedBelmont HotelJulian Brent

Ingested email — Belmont_Balustrade_Finish.eml

We want a warm, living bronze patina — please confirm it matches the approved finish sample.

May 10, 2026 · 5 days ago

DecisionBriargrove EstatesBriargrove Estates

Decision recorded

Gate finish is satin black powder coat over galvanized steel.

DecisionAtlas FoodsAtlas Foods

Decision recorded

Latest vendor load schedule governs conveyor frame detailing.

IngestedBriargrove EstatesHoward Briar

Ingested email — Briargrove_Gate_Approval.eml

Approved. Satin black powder coat over galvanized. Install window the week of June 1 works for us.

IngestedAtlas FoodsSophie Tran

Ingested email — Atlas_Conveyor_Load_Increase.eml

Process engineering needs the conveyor support frames rated for a higher running load than the approved design.

May 9, 2026 · 6 days ago

ConflictHarborline TowerTruth Finder

Conflict detected — Drawing Revision Conflict — Rev B vs. Rev C

The customer approved Rev C while the shop folder marks Rev B as active, and a PM status report claims 70% fabrication complete — likely from the superseded drawing.

ConflictHarborline TowerTruth Finder

Conflict detected — Change Order Not Raised for Rev C Delta

Rev C increases the material take-off (added posts) but no change order has been raised; the contract value still reflects Rev B.

ConflictNorthgate MallTruth Finder

Conflict detected — Material Substitution vs. Approved Submittal

A lighter gauge was discussed on the May 9 call to hold budget, but the approved submittal still specifies the heavier gauge.

ActionNorthgate MallCarl Jensen

Requested substitution (verbal)

Asked on Teams to drop to lighter gauge to hold budget.

DecisionHarborline TowerHarborline GC (Customer)

Decision recorded

Rev C is the approved drawing for railing fabrication.

ActionHarborline TowerRay Donnelly

Approved drawing revision

Approved Rev C — revised top rail, +2 intermediate posts per run.

IngestedHarborline TowerRay Donnelly

Ingested drawing — Harborline_Railing_Rev_C_APPROVED.pdf

Approved — please proceed with Drawing Rev C as attached. Rev C revises the top-rail profile and adds two intermediate posts per run.

IngestedNorthgate MallCarl Jensen

Ingested meeting transcript — Northgate_Budget_Call_Teams_May_9.txt

Customer: can we drop to the lighter gauge to keep the budget?

May 8, 2026 · 7 days ago

DecisionBeacon PlazaProject Steering

Decision recorded

Structural welds on hold pending written EOR weld-spec confirmation.

DecisionMaple CourtProject Steering

Decision recorded

Egress stair tread rating frozen pending fire-rated landing confirmation.

IngestedMaple CourtOwen Pratt

Ingested email — Maple_Stair_Coordination.eml

The landing assembly should be the two-hour rated build-up, please confirm against the architectural spec.

May 7, 2026 · 8 days ago

DecisionVertex Data CenterVertex Infrastructure

Decision recorded

Perforation pattern locked to the architect's approved pattern.

IngestedHarborline TowerKaren Liu

Ingested meeting transcript — Harborline_Coordination_Teams_May_7.txt

Discussion of Rev C impact on post count and install crew sizing. Action: PM to re-baseline date.

IngestedVertex Data CenterAaron Vance, PE

Ingested meeting transcript — Vertex_Screenwall_Teams_May_7.txt

Wind-load basis discussed verbally; to be reconciled with the structural drawing by the EOR.

May 6, 2026 · 9 days ago

ConflictBeacon PlazaTruth Finder

Conflict detected — Weld Spec — Verbal Call vs. Drawing Callout

The May 6 Teams call note cites one weld spec; the approved shop drawing callout cites another. The EOR has not confirmed either in writing.

ConflictBeacon PlazaTruth Finder

Conflict detected — Special Inspection Requirement Unconfirmed

If full-penetration welds govern, special inspection may be required and is not currently scheduled.

ActionBeacon PlazaSusan Park, PE

Verbal weld instruction

Said on Teams: 'go with the full-pen detail on stringer connections.'

DecisionBeacon PlazaDetailing

Decision recorded

Stringer connection detail 4/S-301 governs unless EOR supersedes.

IngestedBeacon PlazaSusan Park, PE

Ingested meeting transcript — Beacon_Stair_Coordination_Teams_May_6.txt

EOR (verbal): go with the full-pen detail on the stringer connections. No special-inspection scheduling discussed.

May 5, 2026 · 10 days ago

ConflictHarborline TowerTruth Finder

Conflict detected — Install Date Promised on Superseded Revision

The PM committed a May 27 install date based on Rev B progress. Rev C adds posts and revises the top rail, changing labor and material.

ActionHarborline TowerDale Forsythe

Committed shop revision

Shop drawings to Rev C by Wednesday (May 13).

ActionHarborline TowerKaren Liu

Committed install date

Locked May 27 install based on ~70% progress (Rev B basis).

IngestedHarborline TowerKaren Liu

Ingested email — Harborline_Railing_PM_Status.eml

Railing fabrication is approximately 70% complete. Install is locked for May 27 based on current progress. Shop will be on Rev C by Wednesday.

May 2, 2026 · 13 days ago

ActionFoundry LoftsDaniel Brooks, PE

Annotated structural sketch

Balcony framing annotated 100 psf — conflicts with 60 psf in requirements PDF.

IngestedFoundry LoftsDaniel Brooks, PE

Ingested drawing — Foundry_Lofts_Structural_Sketch.pdf

Balcony framing annotated 100 psf live load. Members sized accordingly.

Apr 30, 2026 · 15 days ago

IngestedHarborline TowerDale Forsythe

Ingested drawing — MetalWorks_Harborline_Railing_Rev_B.pdf

Rev B drawing set. Marked ACTIVE in the shop folder. Top-rail profile and post spacing differ from Rev C.

Apr 29, 2026 · 16 days ago

IngestedLakeside PavilionNora Whitfield

Ingested email — Lakeside_Canopy_Kickoff.eml

We want it galvanized and then powder coated in the bronze color.

Apr 28, 2026 · 17 days ago

ActionBeacon PlazaMarcus Reed

Issued shop drawing callout

Connection callout: fillet weld per detail 4/S-301.

IngestedBeacon PlazaMarcus Reed

Ingested drawing — Beacon_Stair_Shop_Drawing_S-301.pdf

Connection callout: fillet weld per detail 4/S-301. General notes reference special inspection per IBC where applicable.

Apr 26, 2026 · 19 days ago

ConflictLakeside PavilionTruth Finder

Conflict detected — Coating System Conflict

Spec PDF calls for hot-dip galvanizing only; the kickoff email says galvanize then powder coat.

IngestedLakeside PavilionNora Whitfield

Ingested pdf — Lakeside_Canopy_Spec.pdf

All exposed steel hot-dip galvanized per ASTM A123.

Apr 25, 2026 · 20 days ago

IngestedHarborline TowerRay Donnelly

Ingested pdf — Harborline_Railing_Spec_Section_05.pdf

Metal railing spec: hot-dip galvanize then shop prime. Field-verify slab edge prior to install.

Apr 24, 2026 · 21 days ago

IngestedApex LogisticsMarcus Reed

Ingested drawing — Apex_Pipe_Handrail_Shop_Set.pdf

Dock handrail runs dimensioned 10'-8" on current set.

Apr 22, 2026 · 23 days ago

ConflictFoundry LoftsTruth Finder

Conflict detected — Balcony Live-Load Rating Mismatch

The customer requirements PDF states 60 psf; the structural sketch annotates 100 psf. Detailing should not proceed until frozen.

IngestedFoundry LoftsDaniel Brooks, PE

Ingested pdf — Foundry_Lofts_Requirements.pdf

Juliet balconies designed for 60 psf live load. Exterior stair galvanized.

Apr 20, 2026 · 25 days ago

IngestedBeacon PlazaElena Vasquez

Ingested pdf — Beacon_Stair_Requirements.pdf

Monumental stair: stringers, treads, landings. Connection per EOR.

Apr 18, 2026 · 27 days ago

IngestedMidtown ExchangeMarcus Reed

Ingested pdf — Midtown_Approved_Submittal.pdf

Submittal specifies mechanical expansion anchors at slab edge.

Apr 15, 2026 · 1 month ago

IngestedNorthgate MallMarcus Reed

Ingested pdf — Northgate_Approved_Submittal.pdf

Cladding panels: heavier gauge aluminum, approved as submitted.