Approvals

Everything across every job that's waiting on a human decision — who it's with, how long it's been sitting, and what it costs if it keeps waiting.

11

awaiting approval

$347,700

exposure waiting on a decision

4 weeks

oldest item waiting

HighDetectedNorthgate Mall

Material Substitution vs. Approved Submittal

Issue a formal substitution request and get written approval before cutting.

Waiting onCJCarl JensenOwner's Rep · Northgate Retail Groupwaiting 4 weeks · overdue$17,800$30,000 at risk
MediumDetectedMidtown Exchange

Anchor Type Discrepancy

Confirm anchor type and update the submittal before procurement.

Waiting onGMGreg MasonSite Superintendent · Harborline GCwaiting 4 weeks · overdue$10,900$17,900 at risk
HighDetectedFoundry Lofts

Balcony Live-Load Rating Mismatch

Freeze the governing rating with Anvil's EOR before releasing detailing.

Waiting onDBDaniel Brooks, PEEngineer of Record · Anvil Developmentwaiting 3 weeks · overdue$39,100$54,700 at risk
MediumDetectedApex Logistics

Shop Drawing vs. Customer Dimension Update

Reconcile the May 11 dimensions into the shop set and confirm the active revision.

Waiting onLCLydia ChenFacilities Manager · Apex Logisticswaiting 3 weeks · overdue$23,500$31,000 at risk
MediumDetectedLakeside Pavilion

Coating System Conflict

Confirm the governing coating system with the architect before blasting.

Waiting onNWNora WhitfieldProject Architect · Civic Parks Authoritywaiting 3 weeks · overdue$7,800$14,700 at risk
HighDetectedBeacon Plaza

Weld Spec — Verbal Call vs. Drawing Callout

Obtain written EOR confirmation of the governing weld spec before structural welds proceed.

Waiting onSPSusan Park, PEEngineer of Record · Park Structuralwaiting 3 weeks · overdue$29,700$44,100 at risk
MediumDetectedBeacon Plaza

Special Inspection Requirement Unconfirmed

Confirm inspection requirements with the EOR alongside the weld spec.

Waiting onSPSusan Park, PEEngineer of Record · Park Structuralwaiting 3 weeks · overdue$11,600$18,300 at risk
CriticalDetectedHarborline Tower

Drawing Revision Conflict — Rev B vs. Rev C

Pause work, make Rev C the single active revision, and issue a priced change order for the delta.

Waiting onRDRay DonnellyProject Coordinator · Harborline GCwaiting 2 weeks · overdue$29,100$51,100 at risk
MediumDetectedHarborline Tower

Change Order Not Raised for Rev C Delta

Quantify the Rev C delta and raise a change order before proceeding.

Waiting onRDRay DonnellyProject Coordinator · Harborline GCwaiting 2 weeks · overdue$10,500$18,200 at risk
HighDetectedHarborline Tower

Install Date Promised on Superseded Revision

Re-baseline the install date against Rev C and communicate proactively before the GC plans crews.

Waiting onRDRay DonnellyProject Coordinator · Harborline GCwaiting 11 days · overdue$20,600$34,100 at risk
HighDetectedMidtown Exchange

RFI-Driven Scope Not in Schedule

Reconcile RFI outcomes into the schedule and confirm the sequence with the superintendent.

Waiting onGMGreg MasonSite Superintendent · Harborline GCwaiting 4 days$21,600$33,600 at risk