Metal Works · Project-management truth tracker

Metal Works Truth Finder

Requirements and changes get scattered across Outlook, SharePoint, and Teams meetings. Truth Finder gathers them, finds what was actually agreed, and keeps project management honest — so the team stays aligned and the customer gets clear, realistic commitments.

Powered by a hybrid vector + keyword + graph RAG with temporal, provenance-aware retrieval — every answer is grounded in currently-governing evidence, with superseded sources demoted.

20

Active Projects

View →

6

At Risk

View →

14

Conflicts Detected

View →

38

Unconfirmed Requirements

View →

27

PM Plan Gaps

View →

13

Commitments Not Tracked

View →

Cost of being wrong — live exposure

$0 $0

at risk across 14 exposed jobs · 159 schedule-days exposed if unresolved

Caught this month

$0

rework + escalation Truth Finder flagged before fabrication compounded it (2 conflicts caught early)

Every figure traces to cited evidence — open any conflict to see the cost basis.
Where conflicts come from

45% of open conflicts originate in sharepoint drawing.

SharePoint drawing45%
SharePoint document36%
Outlook email18%

Daily brief — what needs a human today

Open

6 overdue commitments, 6 unconfirmed critical requirements, 1 critical conflicts across 20 active jobs.

6

Overdue commitments

6

Unconfirmed criticals

1

Critical conflicts

Hybrid retrieval — provenance-aware truth

Open Retrieval

Query

What is the latest truth on the Harborline railing?

Current truth: the Harborline railing package is blocked because the shop is fabricating from Rev B while the customer approved Rev C. Rev C revises the top-rail profile and adds two intermediate posts per run, and the install date was promised on the Rev B basis.

Temporal provenance: All retrieved evidence is currently governing — no superseded sources in the top results.
Vector hits27
Keyword hits8
Graph hits11

6

governing

4

superseded

Project health

Distribution across 20 active projects

Conflict detection trend

Detected vs. resolved, last 5 weeks

Latest AI-detected changes

  • Critical1 day ago

    Drawing revision conflict — Harborline shop on Rev B, customer approved Rev C.

  • High2 days ago

    Install date promised on superseded revision — Harborline Railing.

  • High2 days ago

    Weld spec unconfirmed by EOR — Beacon monumental stair.

  • Medium1 day ago

    RFI scope not in schedule — Midtown handrail (23 days stale).

  • High3 days ago

    Material substitution unconfirmed vs. approved submittal — Northgate cladding.

Recent conflicts

View all

Drawing Revision Conflict — Rev B vs. Rev C

Critical

Harborline Tower — Architectural Railing Package

The customer approved Rev C while the shop folder marks Rev B as active, and a PM status report claims 70% fabrication complete — likely from the superseded drawing.

Install Date Promised on Superseded Revision

High

Harborline Tower — Architectural Railing Package

The PM committed a May 27 install date based on Rev B progress. Rev C adds posts and revises the top rail, changing labor and material.

Change Order Not Raised for Rev C Delta

Medium

Harborline Tower — Architectural Railing Package

Rev C increases the material take-off (added posts) but no change order has been raised; the contract value still reflects Rev B.

Weld Spec — Verbal Call vs. Drawing Callout

High

Beacon Plaza — Monumental Stair Fabrication

The May 6 Teams call note cites one weld spec; the approved shop drawing callout cites another. The EOR has not confirmed either in writing.

Integration status

Manage

3 live sources of truth connected · the rest are architecturally ready

Outlook

Connected

Primary source of truth. Customer email + thread ingestion for requirements, approvals, RFIs, PM promises, and dimension updates.

Last sync: 2026-05-15 08:12

via Microsoft Graph

SharePoint

Connected

Primary source of truth. Drawing sets, shop drawings, submittals, specs, and requirement PDFs — with revision discovery and active-version detection.

Last sync: 2026-05-15 07:55

via Microsoft Graph

Microsoft Teams

Connected

Primary source of truth. Coordination meeting transcripts and channel chat with action-item and commitment extraction.

Last sync: 2026-05-14 16:40

via Microsoft Graph

Microsoft Graph

Available

The backbone for Outlook, Teams, SharePoint, OneDrive, and Calendar. OAuth + delegated, permission-aware retrieval.

Last sync:

OneDrive

Available

Personal and shared files: working drafts, sketches.

Last sync:

via Microsoft Graph

MeetGeek AI

Available

Optional transcript enrichment for externally hosted calls.

Last sync:

Smartsheet

Coming Soon

Plan-drift detection: compare evidence against the live schedule.

Last sync:

Microsoft Project

Coming Soon

Timeline/critical-path sync and commitment reconciliation.

Last sync:

We think the schedule is the source of truth. It isn't.

The real truth lives in customer Outlook threads, SharePoint drawing revisions and submittals, Teams coordination calls, RFIs, and promises made on the fly. Truth Finder reads all of that and tells the team what is actually true, who said it, when they said it, what changed, what conflicts, what is missing from the plan, and what to do next — so we stay aligned internally and realistic with the customer.

Resolve he said / she said with evidence.Every answer cites the source.Detect PM plan drift before it becomes an escalation.Project truth, backed by receipts.