Requirements & changes

Every requirement and change across all jobs in one register — what's confirmed, what's still unconfirmed or changed, who owns it, and how sure we are. Filter to what needs locking down.

16 unconfirmed / changed
RequirementProjectStatusPriorityOwnerConf.Trace

Fabricate from latest approved drawing revision

REQ-101

Harborline TowerChangedCriticalDale Forsythe (Shop Lead)92%

Customer approval before material cuts

REQ-102

Harborline TowerConfirmedCriticalDale Forsythe (Shop Lead)90%

Change order on revision scope impact

REQ-103

Harborline TowerNeeds ConfirmationHighKaren Liu (PM)73%

Install date contingent on final approval

REQ-104

Harborline TowerChangedHighKaren Liu (PM)81%

Top-rail profile per Rev C

REQ-105

Harborline TowerConfirmedHighDetailing88%

Two intermediate posts per run (Rev C)

REQ-106

Harborline TowerConfirmedMediumDetailing86%

Hot-dip galvanize then prime

REQ-107

Harborline TowerConfirmedMediumFinishing84%

Field-verify slab edge before install

REQ-108

Harborline TowerNeeds ConfirmationMediumField58%

Governing weld specification

REQ-201

Beacon PlazaNeeds ConfirmationCriticalWelding Lead49%

Stringer connection detail

REQ-202

Beacon PlazaConfirmedHighDetailing87%

Special inspection on full-pen welds

REQ-203

Beacon PlazaDraftHighUnassigned40%

Anchor layout per latest RFI

REQ-301

Midtown ExchangeChangedHighField82%

Balcony live-load rating

REQ-401

Foundry LoftsNeeds ConfirmationCriticalAnvil EOR51%

Corrosion coating system

REQ-501

Lakeside PavilionNeeds ConfirmationHighFinishing47%

Cladding gauge & alloy

REQ-601

Northgate MallNeeds ConfirmationHighDetailing53%

Loading-dock handrail dimensions

REQ-701

Apex LogisticsChangedHighDetailing69%

Fabricate trusses to the approved IFC set

REQ-901

Riverside LogisticsConfirmedCriticalDetailing93%

Mill certs on file before erection

REQ-902

Riverside LogisticsConfirmedHighQA90%

Fire-rated landing detail confirmation

REQ-903

Maple CourtNeeds ConfirmationCriticalDetailing58%

Egress stair tread rating

REQ-904

Maple CourtConfirmedHighDetailing86%

Marine-grade stainless throughout

REQ-905

Harbor MarinaConfirmedCriticalShop Lead92%

Davit working load verified

REQ-906

Harbor MarinaConfirmedHighEngineering89%

Wind-load attachment criteria frozen

REQ-907

Vertex Data CenterNeeds ConfirmationCriticalDetailing55%

Perforated panel pattern per architect

REQ-908

Vertex Data CenterConfirmedMediumDetailing84%

Spiral geometry per approved 3D model

REQ-909

Granary LoftsConfirmedCriticalDetailing92%

Hardwood tread interface

REQ-910

Granary LoftsConfirmedHighDetailing88%

Crash rating per approved submittal

REQ-911

Crossfield StadiumConfirmedCriticalEngineering94%

Embedment depth confirmed

REQ-912

Crossfield StadiumConfirmedHighField90%

Frames detailed to governing load schedule

REQ-913

Atlas FoodsChangedCriticalDetailing64%

Vendor load points reconciled

REQ-914

Atlas FoodsNeeds ConfirmationHighEngineering60%

Bronze patina approved against mockup

REQ-915

Belmont HotelNeeds ConfirmationHighFinishing57%

Balustrade infill spacing per code

REQ-916

Belmont HotelConfirmedMediumDetailing85%

32 of 32 requirements