Metal Works active fabrication jobs — railings, stairs, gates, structural steel, cladding, and more. Truth, conflicts, and plan drift surfaced per project.

Harborline Tower — Architectural Railing Package

Harborline GC · Fabrication

84
Blocked

Architectural guardrail and handrail package for a 9-story tower. Shop is cutting from Rev B while the customer approved Rev C; install date was promised on the Rev B basis.

Open reqs3
Conflicts3
7 sourcessource 1 day ago
plan updated 23 days ago

Beacon Plaza — Monumental Stair Fabrication

Beacon Facilities Group · Fabrication

71
At Risk

Feature monumental stair with stringers, treads, and a structural connection detail. The weld spec cited verbally in a coordination call was never confirmed in writing by the EOR.

Open reqs3
Conflicts2
6 sourcessource 2 days ago
plan updated 11 days ago

Briargrove Estates — Custom Ornamental Gate

Briargrove Estates · Fabrication

21
On Track

Custom ornamental driveway gate with automated operator interface. Customer approvals and shop files are aligned; finish color confirmed in writing.

Open reqs0
Conflicts0
4 sourcessource 3 days ago
plan updated 3 days ago

Midtown Exchange — Commercial Handrail Install

Harborline GC · Construction

63
Outdated Plan

Commercial handrail and guardrail install for a GC. The schedule has not moved in 23 days while three field RFIs changed the anchor layout and install sequence.

Open reqs3
Conflicts2
6 sourcessource 1 day ago
plan updated 24 days ago

Lakeside Pavilion — Steel Canopy & Trellis

Civic Parks Authority · Fabrication

49
Needs Confirmation

Architectural steel canopy and trellis for a public pavilion. Coating system is described inconsistently between the spec PDF and the kickoff email.

Open reqs4
Conflicts1
4 sourcessource 4 days ago
plan updated 13 days ago

Foundry Lofts — Structural Stair & Balcony

Anvil Development · Fabrication

68
At Risk

Exterior structural stair and Juliet balconies for a residential development. Balcony live-load rating is described inconsistently and not yet confirmed by the EOR.

Open reqs4
Conflicts2
5 sourcessource 2 days ago
plan updated 15 days ago

Raleigh Transit — Equipment Mezzanine

Raleigh Transit Authority · Construction

46
Needs Confirmation

Bolted structural steel equipment mezzanine with grating and ship's ladder. A field-measured dimension change was agreed in a meeting but not issued as a change order.

Open reqs3
Conflicts1
4 sourcessource 3 days ago
plan updated 9 days ago

Summit Brewery — Architectural Feature Wall

Summit Hospitality · Fabrication

43
Needs Confirmation

Decorative perforated-panel feature wall. The perforation pattern is described by intent in emails but the approved drawing pattern differs.

Open reqs3
Conflicts1
4 sourcessource 5 days ago
plan updated 10 days ago

Northgate Mall — Storefront Metal Cladding

Northgate Retail Group · Fabrication

66
At Risk

Storefront metal cladding and reveals. A material substitution (gauge and alloy) was discussed in a meeting and may conflict with the approved submittal.

Open reqs4
Conflicts2
5 sourcessource 1 day ago
plan updated 17 days ago

Cedar Ridge — Residential Cable Railing

Cedar Ridge Builders · Fabrication

39
Needs Confirmation

Stainless cable railing for a residential development. Cable spacing vs. local code (4-inch sphere) needs written confirmation against the architect's spacing callout.

Open reqs2
Conflicts1
4 sourcessource 3 days ago
plan updated 8 days ago

Iron Gate Plaza — Decorative Fencing & Bollards

Plaza Partners · Construction

27
On Track

Decorative perimeter fencing and security bollards for a mixed-use plaza. Sources are aligned; install sequence confirmed with the site superintendent.

Open reqs1
Conflicts0
4 sourcessource 2 days ago
plan updated 4 days ago

Apex Logistics — Industrial Pipe Handrail

Apex Logistics · Construction

41
Needs Confirmation

Industrial pipe handrail and safety gates for a distribution facility. The latest shop drawing set on the SharePoint does not match the dimensions in the customer's latest email.

Open reqs3
Conflicts1
4 sourcessource 3 days ago
plan updated 8 days ago

Riverside Logistics — Long-Span Roof Trusses

Riverside Logistics · Fabrication

24
On Track

Long-span bar-joist roof trusses for a distribution warehouse. Approved drawings, mill certs, and the install sequence are aligned across Outlook and SharePoint.

Open reqs1
Conflicts0
3 sourcessource 2 days ago
plan updated 3 days ago

Maple Court — Egress Stair Towers

Maple Court Partners · Construction

44
Needs Confirmation

Two prefabricated egress stair towers. The fire-rating assembly is described one way in the spec and another in a coordination email.

Open reqs2
Conflicts0
3 sourcessource 3 days ago
plan updated 9 days ago

Harbor Marina — Steel Davits & Gangway

Harbor Marina Authority · Fabrication

22
On Track

Galvanized steel davits and an aluminum-decked gangway for a public marina. Loads, finish, and delivery are confirmed in writing.

Open reqs0
Conflicts0
3 sourcessource 2 days ago
plan updated 2 days ago

Vertex Data Center — Rooftop Equipment Screen Wall

Vertex Infrastructure · Construction

47
Needs Confirmation

Rooftop mechanical screen wall with perforated panels. Wind-load basis cited in a Teams call has not been confirmed against the structural drawing.

Open reqs3
Conflicts0
3 sourcessource 3 days ago
plan updated 10 days ago

Granary Lofts — Architectural Spiral Stair

Granary Development · Fabrication

28
On Track

Feature architectural spiral stair with a continuous formed stringer. Geometry, finish, and field dimensions are confirmed.

Open reqs1
Conflicts0
3 sourcessource 3 days ago
plan updated 4 days ago

Crossfield Stadium — Security Bollard Line

Crossfield Stadium Authority · Construction

26
On Track

Anti-ram security bollard line at a stadium concourse. Crash rating, foundation detail, and layout are confirmed against the approved submittal.

Open reqs1
Conflicts0
3 sourcessource 2 days ago
plan updated 3 days ago

Atlas Foods — Structural Conveyor Support Frames

Atlas Foods · Fabrication

61
At Risk

Structural support frames for an overhead conveyor in a food plant. A load increase requested by the customer's process engineer is not yet reflected in the approved frame design.

Open reqs3
Conflicts0
3 sourcessource 2 days ago
plan updated 13 days ago

Belmont Hotel — Bronze Lobby Balustrade

Belmont Hospitality · Fabrication

42
Needs Confirmation

Architectural bronze balustrade for a hotel lobby renovation. The patina finish is described by intent in emails and differs from the approved finish sample callout.

Open reqs2
Conflicts0
3 sourcessource 4 days ago
plan updated 8 days ago