Demo Mode
MW

Resolve — close the loop

Detection is only half the job. Move each conflict Detected → Drafted → Sent → Confirmed → Resolved and watch the cost-of-being-wrong come back. Resolving here also updates Conflicts and the dashboard.

$284,950

Still at risk · 11 open conflicts

$0

Recovered · 0 closed

0%

Exposure recovered · of baseline cost-of-being-wrong

HighFoundry Lofts

Balcony Live-Load Rating Mismatch

$39,100$54,700

at risk

Stage: Detected

CriticalHarborline Tower

Drawing Revision Conflict — Rev B vs. Rev C

$29,100$51,100

at risk

Stage: Detected

HighBeacon Plaza

Weld Spec — Verbal Call vs. Drawing Callout

$29,700$44,100

at risk

Stage: Detected

HighHarborline Tower

Install Date Promised on Superseded Revision

$20,600$34,100

at risk

Stage: Detected

HighMidtown Exchange

RFI-Driven Scope Not in Schedule

$21,600$33,600

at risk

Stage: Detected

MediumApex Logistics

Shop Drawing vs. Customer Dimension Update

$23,500$31,000

at risk

Stage: Detected

HighNorthgate Mall

Material Substitution vs. Approved Submittal

$17,800$30,000

at risk

Stage: Detected

MediumBeacon Plaza

Special Inspection Requirement Unconfirmed

$11,600$18,300

at risk

Stage: Detected

MediumHarborline Tower

Change Order Not Raised for Rev C Delta

$10,500$18,200

at risk

Stage: Detected

MediumMidtown Exchange

Anchor Type Discrepancy

$10,900$17,900

at risk

Stage: Detected

MediumLakeside Pavilion

Coating System Conflict

$7,800$14,700

at risk

Stage: Detected