Sources
Every connected file and communication, what was extracted from it, and how reliable it is. Turn messy customer communication into structured requirements.
Harborline_Railing_Rev_C_APPROVED.pdf
Drawing · Harborline Tower — Architectural Railing Package
Approved — please proceed with Drawing Rev C as attached. Rev C revises the top-rail profile and adds two intermediate posts per run.
4
Reqs
1
Decs
1
Cmts
3
Confl
Reliability 94%
MetalWorks_Harborline_Railing_Rev_B.pdf
Drawing · Harborline Tower — Architectural Railing Package
Rev B drawing set. Marked ACTIVE in the shop folder. Top-rail profile and post spacing differ from Rev C.
2
Reqs
0
Decs
0
Cmts
2
Confl
Reliability 88%
Harborline_Railing_Spec_Section_05.pdf
PDF · Harborline Tower — Architectural Railing Package
Metal railing spec: hot-dip galvanize then shop prime. Field-verify slab edge prior to install.
3
Reqs
0
Decs
0
Cmts
0
Confl
Reliability 86%
Harborline_Railing_PM_Status.eml
Email · Harborline Tower — Architectural Railing Package
Railing fabrication is approximately 70% complete. Install is locked for May 27 based on current progress. Shop will be on Rev C by Wednesday.
1
Reqs
1
Decs
2
Cmts
2
Confl
Reliability 75%
Harborline_Coordination_Teams_May_7.txt
Meeting Transcript · Harborline Tower — Architectural Railing Package
Discussion of Rev C impact on post count and install crew sizing. Action: PM to re-baseline date.
1
Reqs
0
Decs
1
Cmts
1
Confl
Reliability 81%
Harborline_RFI_Log.xlsx
Spreadsheet · Harborline Tower — Architectural Railing Package
Open RFIs: top-rail termination at stair, embed plate locations.
1
Reqs
0
Decs
0
Cmts
0
Confl
Reliability 72%
Beacon_Stair_Coordination_Teams_May_6.txt
Meeting Transcript · Beacon Plaza — Monumental Stair Fabrication
EOR (verbal): go with the full-pen detail on the stringer connections. No special-inspection scheduling discussed.
2
Reqs
1
Decs
2
Cmts
2
Confl
Reliability 78%
Beacon_Stair_Shop_Drawing_S-301.pdf
Drawing · Beacon Plaza — Monumental Stair Fabrication
Connection callout: fillet weld per detail 4/S-301. General notes reference special inspection per IBC where applicable.
2
Reqs
1
Decs
0
Cmts
2
Confl
Reliability 90%
Beacon_Stair_Requirements.pdf
PDF · Beacon Plaza — Monumental Stair Fabrication
Monumental stair: stringers, treads, landings. Connection per EOR.
3
Reqs
0
Decs
0
Cmts
1
Confl
Reliability 84%
Midtown_RFI_014_Response.eml
Email · Midtown Exchange — Commercial Handrail Install
Proceed with revised anchor layout per attached sketch. Revised detail indicates adhesive (epoxy) anchors at slab edge. This supersedes the original detail.
2
Reqs
1
Decs
1
Cmts
2
Confl
Reliability 86%
Midtown_Schedule_Export_May_14.xlsx
Smartsheet Export · Midtown Exchange — Commercial Handrail Install
Last modified Apr 21. No RFI tasks present in the schedule.
0
Reqs
0
Decs
0
Cmts
1
Confl
Reliability 95%
Midtown_Approved_Submittal.pdf
PDF · Midtown Exchange — Commercial Handrail Install
Submittal specifies mechanical expansion anchors at slab edge.
1
Reqs
0
Decs
1
Cmts
1
Confl
Reliability 89%
Foundry_Lofts_Requirements.pdf
PDF · Foundry Lofts — Structural Stair & Balcony
Juliet balconies designed for 60 psf live load. Exterior stair galvanized.
3
Reqs
0
Decs
1
Cmts
1
Confl
Reliability 83%
Foundry_Lofts_Structural_Sketch.pdf
Drawing · Foundry Lofts — Structural Stair & Balcony
Balcony framing annotated 100 psf live load. Members sized accordingly.
2
Reqs
0
Decs
0
Cmts
1
Confl
Reliability 80%
Lakeside_Canopy_Spec.pdf
PDF · Lakeside Pavilion — Steel Canopy & Trellis
All exposed steel hot-dip galvanized per ASTM A123.
3
Reqs
0
Decs
0
Cmts
1
Confl
Reliability 87%
Lakeside_Canopy_Kickoff.eml
Email · Lakeside Pavilion — Steel Canopy & Trellis
We want it galvanized and then powder coated in the bronze color.
1
Reqs
0
Decs
1
Cmts
1
Confl
Reliability 79%
Northgate_Budget_Call_Teams_May_9.txt
Meeting Transcript · Northgate Mall — Storefront Metal Cladding
Customer: can we drop to the lighter gauge to keep the budget?
2
Reqs
0
Decs
1
Cmts
1
Confl
Reliability 77%
Northgate_Approved_Submittal.pdf
PDF · Northgate Mall — Storefront Metal Cladding
Cladding panels: heavier gauge aluminum, approved as submitted.
2
Reqs
1
Decs
0
Cmts
1
Confl
Reliability 91%
Apex_Dock_Dimensions_Update.eml
Email · Apex Logistics — Industrial Pipe Handrail
The dock handrail runs are 11'-4", not 10'-8" as previously drawn.
2
Reqs
1
Decs
1
Cmts
1
Confl
Reliability 82%
Apex_Pipe_Handrail_Shop_Set.pdf
Drawing · Apex Logistics — Industrial Pipe Handrail
Dock handrail runs dimensioned 10'-8" on current set.
2
Reqs
0
Decs
0
Cmts
1
Confl
Reliability 88%
Briargrove_Gate_Approval.eml
Email · Briargrove Estates — Custom Ornamental Gate
Approved. Satin black powder coat over galvanized. Install window the week of June 1 works for us.
4
Reqs
3
Decs
1
Cmts
0
Confl
Reliability 93%
Riverside_Truss_Set_APPROVED.pdf
Drawing · Riverside Logistics — Long-Span Roof Trusses
Approved long-span truss set. Erection sequence and crane pick plan confirmed by email.
4
Reqs
2
Decs
1
Cmts
0
Confl
Reliability 92%
Maple_Stair_Coordination.eml
Email · Maple Court — Egress Stair Towers
The landing assembly should be the two-hour rated build-up, please confirm against the architectural spec.
2
Reqs
1
Decs
1
Cmts
0
Confl
Reliability 76%
Harbor_Davit_Load_Sheet.pdf
PDF · Harbor Marina — Steel Davits & Gangway
Davit working load and gangway live load confirmed. Hot-dip galvanized finish, delivery week of June 15.
4
Reqs
2
Decs
1
Cmts
0
Confl
Reliability 93%
Vertex_Screenwall_Teams_May_7.txt
Meeting Transcript · Vertex Data Center — Rooftop Equipment Screen Wall
Wind-load basis discussed verbally; to be reconciled with the structural drawing by the EOR.
2
Reqs
1
Decs
2
Cmts
0
Confl
Reliability 75%
Granary_Spiral_Geometry_APPROVED.pdf
Drawing · Granary Lofts — Architectural Spiral Stair
Approved spiral geometry; shaft dimensions field-verified and finish confirmed.
3
Reqs
2
Decs
1
Cmts
0
Confl
Reliability 90%
Crossfield_Bollard_Submittal.pdf
PDF · Crossfield Stadium — Security Bollard Line
Crash-rated bollard submittal approved; foundation detail and surveyed layout confirmed.
3
Reqs
2
Decs
1
Cmts
0
Confl
Reliability 90%
Atlas_Conveyor_Load_Increase.eml
Email · Atlas Foods — Structural Conveyor Support Frames
Process engineering needs the conveyor support frames rated for a higher running load than the approved design.
3
Reqs
1
Decs
2
Cmts
0
Confl
Reliability 79%
Belmont_Balustrade_Finish.eml
Email · Belmont Hotel — Bronze Lobby Balustrade
We want a warm, living bronze patina — please confirm it matches the approved finish sample.
2
Reqs
1
Decs
1
Cmts
0
Confl
Reliability 77%