Every connected file and communication, what was extracted from it, and how reliable it is. Turn messy customer communication into structured requirements.

Harborline_Railing_Rev_C_APPROVED.pdf

Drawing · Harborline Tower — Architectural Railing Package

Ingested

Approved — please proceed with Drawing Rev C as attached. Rev C revises the top-rail profile and adds two intermediate posts per run.

4

Reqs

1

Decs

1

Cmts

3

Confl

Harborline GC · May 9, 2026

Reliability 94%

MetalWorks_Harborline_Railing_Rev_B.pdf

Drawing · Harborline Tower — Architectural Railing Package

Ingested

Rev B drawing set. Marked ACTIVE in the shop folder. Top-rail profile and post spacing differ from Rev C.

2

Reqs

0

Decs

0

Cmts

2

Confl

Shop Folder (SharePoint) · Apr 30, 2026

Reliability 88%

Harborline_Railing_Spec_Section_05.pdf

PDF · Harborline Tower — Architectural Railing Package

Ingested

Metal railing spec: hot-dip galvanize then shop prime. Field-verify slab edge prior to install.

3

Reqs

0

Decs

0

Cmts

0

Confl

Harborline GC · Apr 25, 2026

Reliability 86%

Harborline_Railing_PM_Status.eml

Email · Harborline Tower — Architectural Railing Package

Ingested

Railing fabrication is approximately 70% complete. Install is locked for May 27 based on current progress. Shop will be on Rev C by Wednesday.

1

Reqs

1

Decs

2

Cmts

2

Confl

Karen Liu (PM) · May 5, 2026

Reliability 75%

Harborline_Coordination_Teams_May_7.txt

Meeting Transcript · Harborline Tower — Architectural Railing Package

Ingested

Discussion of Rev C impact on post count and install crew sizing. Action: PM to re-baseline date.

1

Reqs

0

Decs

1

Cmts

1

Confl

Microsoft Teams (coordination call) · May 7, 2026

Reliability 81%

Harborline_RFI_Log.xlsx

Spreadsheet · Harborline Tower — Architectural Railing Package

Processing

Open RFIs: top-rail termination at stair, embed plate locations.

1

Reqs

0

Decs

0

Cmts

0

Confl

SharePoint · May 12, 2026

Reliability 72%

Beacon_Stair_Coordination_Teams_May_6.txt

Meeting Transcript · Beacon Plaza — Monumental Stair Fabrication

Ingested

EOR (verbal): go with the full-pen detail on the stringer connections. No special-inspection scheduling discussed.

2

Reqs

1

Decs

2

Cmts

2

Confl

Microsoft Teams (coordination call) · May 6, 2026

Reliability 78%

Beacon_Stair_Shop_Drawing_S-301.pdf

Drawing · Beacon Plaza — Monumental Stair Fabrication

Ingested

Connection callout: fillet weld per detail 4/S-301. General notes reference special inspection per IBC where applicable.

2

Reqs

1

Decs

0

Cmts

2

Confl

SharePoint · Apr 28, 2026

Reliability 90%

Beacon_Stair_Requirements.pdf

PDF · Beacon Plaza — Monumental Stair Fabrication

Ingested

Monumental stair: stringers, treads, landings. Connection per EOR.

3

Reqs

0

Decs

0

Cmts

1

Confl

Beacon Facilities Group · Apr 20, 2026

Reliability 84%

Midtown_RFI_014_Response.eml

Email · Midtown Exchange — Commercial Handrail Install

Ingested

Proceed with revised anchor layout per attached sketch. Revised detail indicates adhesive (epoxy) anchors at slab edge. This supersedes the original detail.

2

Reqs

1

Decs

1

Cmts

2

Confl

Harborline GC · May 12, 2026

Reliability 86%

Midtown_Schedule_Export_May_14.xlsx

Smartsheet Export · Midtown Exchange — Commercial Handrail Install

Ingested

Last modified Apr 21. No RFI tasks present in the schedule.

0

Reqs

0

Decs

0

Cmts

1

Confl

PM Tool Sync · May 14, 2026

Reliability 95%

Midtown_Approved_Submittal.pdf

PDF · Midtown Exchange — Commercial Handrail Install

Ingested

Submittal specifies mechanical expansion anchors at slab edge.

1

Reqs

0

Decs

1

Cmts

1

Confl

SharePoint · Apr 18, 2026

Reliability 89%

Foundry_Lofts_Requirements.pdf

PDF · Foundry Lofts — Structural Stair & Balcony

Ingested

Juliet balconies designed for 60 psf live load. Exterior stair galvanized.

3

Reqs

0

Decs

1

Cmts

1

Confl

Anvil Development · Apr 22, 2026

Reliability 83%

Foundry_Lofts_Structural_Sketch.pdf

Drawing · Foundry Lofts — Structural Stair & Balcony

Ingested

Balcony framing annotated 100 psf live load. Members sized accordingly.

2

Reqs

0

Decs

0

Cmts

1

Confl

SharePoint · May 2, 2026

Reliability 80%

Lakeside_Canopy_Spec.pdf

PDF · Lakeside Pavilion — Steel Canopy & Trellis

Ingested

All exposed steel hot-dip galvanized per ASTM A123.

3

Reqs

0

Decs

0

Cmts

1

Confl

Civic Parks Authority · Apr 26, 2026

Reliability 87%

Lakeside_Canopy_Kickoff.eml

Email · Lakeside Pavilion — Steel Canopy & Trellis

Ingested

We want it galvanized and then powder coated in the bronze color.

1

Reqs

0

Decs

1

Cmts

1

Confl

Civic Parks Authority · Apr 29, 2026

Reliability 79%

Northgate_Budget_Call_Teams_May_9.txt

Meeting Transcript · Northgate Mall — Storefront Metal Cladding

Ingested

Customer: can we drop to the lighter gauge to keep the budget?

2

Reqs

0

Decs

1

Cmts

1

Confl

Microsoft Teams (coordination call) · May 9, 2026

Reliability 77%

Northgate_Approved_Submittal.pdf

PDF · Northgate Mall — Storefront Metal Cladding

Ingested

Cladding panels: heavier gauge aluminum, approved as submitted.

2

Reqs

1

Decs

0

Cmts

1

Confl

SharePoint · Apr 15, 2026

Reliability 91%

Apex_Dock_Dimensions_Update.eml

Email · Apex Logistics — Industrial Pipe Handrail

Ingested

The dock handrail runs are 11'-4", not 10'-8" as previously drawn.

2

Reqs

1

Decs

1

Cmts

1

Confl

Apex Logistics · May 11, 2026

Reliability 82%

Apex_Pipe_Handrail_Shop_Set.pdf

Drawing · Apex Logistics — Industrial Pipe Handrail

Ingested

Dock handrail runs dimensioned 10'-8" on current set.

2

Reqs

0

Decs

0

Cmts

1

Confl

SharePoint · Apr 24, 2026

Reliability 88%

Briargrove_Gate_Approval.eml

Email · Briargrove Estates — Custom Ornamental Gate

Ingested

Approved. Satin black powder coat over galvanized. Install window the week of June 1 works for us.

4

Reqs

3

Decs

1

Cmts

0

Confl

Briargrove Estates · May 10, 2026

Reliability 93%

Riverside_Truss_Set_APPROVED.pdf

Drawing · Riverside Logistics — Long-Span Roof Trusses

Ingested

Approved long-span truss set. Erection sequence and crane pick plan confirmed by email.

4

Reqs

2

Decs

1

Cmts

0

Confl

Riverside Logistics · May 13, 2026

Reliability 92%

Maple_Stair_Coordination.eml

Email · Maple Court — Egress Stair Towers

Ingested

The landing assembly should be the two-hour rated build-up, please confirm against the architectural spec.

2

Reqs

1

Decs

1

Cmts

0

Confl

Maple Court Partners · May 8, 2026

Reliability 76%

Harbor_Davit_Load_Sheet.pdf

PDF · Harbor Marina — Steel Davits & Gangway

Ingested

Davit working load and gangway live load confirmed. Hot-dip galvanized finish, delivery week of June 15.

4

Reqs

2

Decs

1

Cmts

0

Confl

Harbor Marina Authority · May 13, 2026

Reliability 93%

Vertex_Screenwall_Teams_May_7.txt

Meeting Transcript · Vertex Data Center — Rooftop Equipment Screen Wall

Ingested

Wind-load basis discussed verbally; to be reconciled with the structural drawing by the EOR.

2

Reqs

1

Decs

2

Cmts

0

Confl

Microsoft Teams (coordination call) · May 7, 2026

Reliability 75%

Granary_Spiral_Geometry_APPROVED.pdf

Drawing · Granary Lofts — Architectural Spiral Stair

Ingested

Approved spiral geometry; shaft dimensions field-verified and finish confirmed.

3

Reqs

2

Decs

1

Cmts

0

Confl

Granary Development · May 12, 2026

Reliability 90%

Crossfield_Bollard_Submittal.pdf

PDF · Crossfield Stadium — Security Bollard Line

Ingested

Crash-rated bollard submittal approved; foundation detail and surveyed layout confirmed.

3

Reqs

2

Decs

1

Cmts

0

Confl

Crossfield Stadium Authority · May 13, 2026

Reliability 90%

Atlas_Conveyor_Load_Increase.eml

Email · Atlas Foods — Structural Conveyor Support Frames

Ingested

Process engineering needs the conveyor support frames rated for a higher running load than the approved design.

3

Reqs

1

Decs

2

Cmts

0

Confl

Atlas Foods · May 10, 2026

Reliability 79%

Belmont_Balustrade_Finish.eml

Email · Belmont Hotel — Bronze Lobby Balustrade

Ingested

We want a warm, living bronze patina — please confirm it matches the approved finish sample.

2

Reqs

1

Decs

1

Cmts

0

Confl

Belmont Hospitality · May 11, 2026

Reliability 77%