All projects
Beacon Plaza — Monumental Stair Fabrication
At RiskBeacon Facilities Group · Fabrication · Last source update May 13, 2026
71
High
risk score
Current truth
Stair fabrication is progressing but the welding specification cited verbally on the May 6 Teams coordination call has not been confirmed by the engineer of record. The shop drawing callout and the verbal note disagree.
AI confidence80%
Source coverage70%
Open questions
- Which weld spec governs — the May 6 call note or the original drawing callout?
- Does the connection detail require special inspection?
Next recommended action
Get written confirmation of the governing weld spec from the engineer of record before any structural welds proceed.
Resolve in Chat
5
Confirmed requirements
3
Open requirements
2
Conflicts
2
Untracked commitments
Summary
Feature monumental stair with stringers, treads, and a structural connection detail. The weld spec cited verbally in a coordination call was never confirmed in writing by the EOR.