Demo Mode
MW
All projects

Beacon Plaza — Monumental Stair Fabrication

At Risk

Beacon Facilities Group · Fabrication · Last source update May 13, 2026

71
High
risk score

Current truth

Stair fabrication is progressing but the welding specification cited verbally on the May 6 Teams coordination call has not been confirmed by the engineer of record. The shop drawing callout and the verbal note disagree.

AI confidence80%
Source coverage70%

Open questions

  • Which weld spec governs — the May 6 call note or the original drawing callout?
  • Does the connection detail require special inspection?

Next recommended action

Get written confirmation of the governing weld spec from the engineer of record before any structural welds proceed.

Resolve in Chat

5

Confirmed requirements

3

Open requirements

2

Conflicts

2

Untracked commitments

Summary

Feature monumental stair with stringers, treads, and a structural connection detail. The weld spec cited verbally in a coordination call was never confirmed in writing by the EOR.

Source coverage