Cedar Ridge — Residential Cable Railing

Needs Confirmation

Cedar Ridge Builders · Fabrication · Last source update May 12, 2026

39
Moderate
risk score

Current truth

Cable railing fabrication is mostly aligned, but the architect's cable spacing callout may not satisfy the local 4-inch-sphere code; this needs written confirmation.

AI confidence76%
Source coverage66%

Open questions

  • Does the specified cable spacing pass the 4-inch-sphere test?

Next recommended action

Confirm cable spacing and intermediate-picket strategy with the architect to satisfy code before tensioning hardware is ordered.

Resolve in Chat

5

Confirmed requirements

2

Open requirements

1

Conflicts

0

Untracked commitments

Summary

Stainless cable railing for a residential development. Cable spacing vs. local code (4-inch sphere) needs written confirmation against the architect's spacing callout.