All projects
Cedar Ridge — Residential Cable Railing
Needs ConfirmationCedar Ridge Builders · Fabrication · Last source update May 12, 2026
39
Moderate
risk score
Current truth
Cable railing fabrication is mostly aligned, but the architect's cable spacing callout may not satisfy the local 4-inch-sphere code; this needs written confirmation.
AI confidence76%
Source coverage66%
Open questions
- Does the specified cable spacing pass the 4-inch-sphere test?
Next recommended action
Confirm cable spacing and intermediate-picket strategy with the architect to satisfy code before tensioning hardware is ordered.
Resolve in Chat
5
Confirmed requirements
2
Open requirements
1
Conflicts
0
Untracked commitments
Summary
Stainless cable railing for a residential development. Cable spacing vs. local code (4-inch sphere) needs written confirmation against the architect's spacing callout.