Harborline Tower — Architectural Railing Package

Blocked

Harborline GC · Fabrication · Last source update May 14, 2026

84
Critical
risk score

Current truth

This job is at risk because the latest customer-approved drawings (Rev C) do not match the shop team's current working files (Rev B). Rev C revises the top-rail profile and adds two intermediate posts per run.

AI confidence91%
Source coverage83%

Open questions

  • Has the shop foreman formally acknowledged Rev C?
  • Does Rev C change material take-off enough to require a priced change order?
  • Is the promised May 27 install date still feasible under Rev C?

Next recommended action

Pause fabrication until Rev C is acknowledged by the shop and the change-order impact on material and install date is reviewed.

Resolve in Chat

5

Confirmed requirements

3

Open requirements

3

Conflicts

2

Untracked commitments

Summary

Architectural guardrail and handrail package for a 9-story tower. Shop is cutting from Rev B while the customer approved Rev C; install date was promised on the Rev B basis.

Source coverage