Harborline Tower — Architectural Railing Package
BlockedHarborline GC · Fabrication · Last source update May 14, 2026
84
Critical
risk score
Current truth
This job is at risk because the latest customer-approved drawings (Rev C) do not match the shop team's current working files (Rev B). Rev C revises the top-rail profile and adds two intermediate posts per run.
AI confidence91%
Source coverage83%
Open questions
- Has the shop foreman formally acknowledged Rev C?
- Does Rev C change material take-off enough to require a priced change order?
- Is the promised May 27 install date still feasible under Rev C?
Next recommended action
Pause fabrication until Rev C is acknowledged by the shop and the change-order impact on material and install date is reviewed.
Resolve in Chat
5
Confirmed requirements
3
Open requirements
3
Conflicts
2
Untracked commitments
Summary
Architectural guardrail and handrail package for a 9-story tower. Shop is cutting from Rev B while the customer approved Rev C; install date was promised on the Rev B basis.