Raleigh Transit — Equipment Mezzanine

Needs Confirmation

Raleigh Transit Authority · Construction · Last source update May 12, 2026

46
Moderate
risk score

Current truth

The mezzanine footprint changed after field measurement. The change was agreed verbally on the May 7 call but no change order has been issued and the shop drawings still show the old dimension.

AI confidence79%
Source coverage68%

Open questions

  • Which footprint governs — the original drawing or the field measurement?

Next recommended action

Issue a change order for the revised footprint and reissue shop drawings before grating is cut.

Resolve in Chat

6

Confirmed requirements

3

Open requirements

1

Conflicts

0

Untracked commitments

Summary

Bolted structural steel equipment mezzanine with grating and ship's ladder. A field-measured dimension change was agreed in a meeting but not issued as a change order.