RE: Harborline Tower — Railing drawings for approval (Rev C)
Ray Donnelly <ray.donnelly@harborline-gc.example>
to Karen Liu <kliu@metalworks.example>
cc Greg Mason <gmason@harborline-gc.example>
Karen,
Approved — please proceed with Drawing Rev C as attached. To be explicit so there is no ambiguity in the shop:
• Rev C revises the top-rail profile (the flat-bar cap is now a 2" round). • Rev C adds two intermediate posts per guardrail run. • Everything else carries over from Rev B unchanged.
Rev C is the governing set from here forward. Please make sure the shop is pulling Rev C and not the older Rev B package — the architect signed off on the round cap specifically and we cannot have the flat-bar version installed.
We still want to hold the week of May 27 for install if it is at all possible. Let me know if the added posts change that.
Thanks, Ray Donnelly Project Coordinator, Harborline GC