SharePoint drawing · Beacon Plaza

Document viewer

The source as it was actually received — with the spans Truth Finder extracted into requirements, conflicts, and decisions highlighted in place.

SharePoint · Drawing

Beacon_Stair_Shop_Drawing_S-301.pdf

Issued by: Marcus Reed (Detailing, Metal Works) · Apr 28, 2026
Extracted drawing content:
CONNECTION CALLOUT (Detail 4/S-301): fillet weld, 5/16", per stringer-to-
landing connection.
GENERAL NOTE 7: Special inspection per IBC Chapter 17 where applicable.
Truth Finder note · the drawing callout (fillet) disagrees with the EOR's May 6 verbal instruction (full-pen). The EOR has not issued a written revision.